Infrastructure

Inventaris, Kapasitas & Kondisi Fasilitas Datacenter

Rack Management • Device Inventory • Facility Health

Datacenter StatusONLINE
14 May 202510:24:37 WIB
ADAdministratorSuper Admin

Total Rack

12

3 zona ruang server

Physical Server

48

46 online • 2 maintenance

Virtual Machine

86

84 running • 2 suspended

Network Device

14

core, distribusi, akses

Security Device

6

firewall, IPS, WAF

Rack Space

62%

312 dari 504 U terpakai

Rack Layout & Okupansi

OnlineWarningMaintenanceOffline

Konsumsi Daya per Rack (kW)

Ambang peringatan 7.5 kW per rack

Fasilitas & Lingkungan

Total Dayakapasitas 120 kW78 kW
PUEtarget ≤ 1.501.42
Suhu Rata-rataambang 18–27 °C22.5 °C
Cooling Load4 unit precision AC64%
Koridor ruang server datacenter

Inventaris Perangkat Infrastruktur

PerangkatTipeLokasiIPCPUMemoriUptimeStatus
ESXi-NODE-01ServerRACK-A0110.20.1.1146%62%182 hariOnline
ESXi-NODE-02ServerRACK-A0110.20.1.1251%68%182 hariOnline
ESXi-NODE-03ServerRACK-A0310.20.1.1382%88%97 hariWarning
DB-CLUSTER-01ServerRACK-B0110.20.2.2164%74%240 hariOnline
DB-CLUSTER-02ServerRACK-B0110.20.2.2258%71%240 hariOnline
BACKUP-NODE-01ServerRACK-B0410.20.2.3112%28%Maintenance
SAN-STORAGE-01StorageRACK-C0110.20.3.1022%41%365 hariOnline
NAS-ARCHIVE-01StorageRACK-C0210.20.3.149%25%301 hariOnline
CORE-SWITCH-01NetworkRACK-A0210.20.0.128%36%410 hariOnline
CORE-SWITCH-02NetworkRACK-A0210.20.0.226%34%410 hariOnline
DIST-SWITCH-03NetworkRACK-B0210.20.0.731%39%128 hariOnline
ACCESS-SW-09NetworkRACK-C0310.20.0.190%0%Offline
FIREWALL-EDGE-01SecurityRACK-A0410.20.0.25444%52%298 hariOnline
IPS-SENSOR-01SecurityRACK-A0410.20.0.25337%48%298 hariOnline
UPS-MODULE-01PowerZone A10.20.9.110%0%512 hariOnline
PRECISION-AC-02CoolingZone B10.20.9.220%0%377 hariWarning

Jadwal Pemeliharaan

  • Firmware upgrade node ESXi

    RACK-A03 • ESXi-NODE-03

    18 Mei 2025 • 23:00–02:00Tim Virtualisasi

  • Penggantian modul access switch

    RACK-C03 • ACCESS-SW-09

    16 Mei 2025 • 21:00–23:00Tim Jaringan

  • Preventive maintenance UPS

    Zone A • UPS-MODULE-01

    22 Mei 2025 • 09:00–12:00Tim Fasilitas

  • Cleaning filter precision AC

    Zone B • PRECISION-AC-02

    24 Mei 2025 • 10:00–13:00Vendor Cooling

Tidak ada pekerjaan tertunda